Asher Kim Portfolio №02 · This is a fictional company. No real quotes, orders, or consultations. · Fictional company

Solutions

Each job, its own path.

From welding to dispensing, we fit Hangyeol robots to eight applications across six industries. One team stays with you from the first spec review to operator training.

Eight applications

Eight jobs, eight paths.

Each plate traces the same process dozens of times over. The paths drift a little in the air and meet at one point where the work happens.

Six industries

Six industries, one standard.

Processes and parts change from one industry to the next. The standard does not: every robot has its repeatability measured before it ships.

Seven steps

One team, spec to training.

The engineer you meet first stays through commissioning and training. Every step ends with a set of documents you keep.

Title
Delivery schedule
Drawing no.
HG-DWG-230
Scale
NTS
Unit
wk
ShortestLongest (depends on cell size and robot count)
  1. 1. Requirements

    Who is involved: Our sales engineer and your production engineering team

    We review the workpiece, the process, the target cycle time, and the floor space with you. Drawings, photos, or a video of the current process help a lot.

    You receiveProcess requirements sheet

    Typical time1–2 weeks

  2. 2. Concept and quote

    Who is involved: Our application engineers

    We lay out the cell in Hangyeol Studio and simulate the cycle time. The quote covers the robot, tooling, peripheral equipment, and safety equipment.

    You receiveCell layout, cycle time report, quote

    Typical time2–3 weeks

  3. 3. Contract

    Who is involved: Our sales team and your purchasing team

    We put the specification, schedule, and acceptance criteria in writing. If you apply for a government support program, we prepare the supply specification for your application.

    You receiveContract, schedule, acceptance criteria

    Typical timeAbout 1 week

  4. 4. Build

    Who is involved: Our production and quality teams

    We build the robot, tooling, and fixtures at our Dalseong plant, then assemble and run the cell in-house. You join us for a factory acceptance test before it ships.

    You receiveFinal inspection record, factory acceptance record

    Typical time4–10 weeks, depending on the cell

  5. 5. Installation

    Who is involved: Our technical center and your facilities team

    Engineers from our technical centers set the robot and cell in place and finish the wiring and air lines. We schedule around your downtime to keep the line stop short.

    You receiveInstallation record

    Typical time3 days to 2 weeks

  6. 6. Commissioning

    Who is involved: Our application engineers and your production team

    We tune the program on real parts until the cell meets the target cycle time. We measure the safety settings, stopping times, and stopping distances and hand them over for your risk assessment.

    You receiveCommissioning record, safety settings

    Typical time1–4 weeks

  7. 7. Training and handover

    Who is involved: Our academy instructors and your operators and maintenance staff

    Your operators and maintenance staff learn operation and inspection through Hangyeol Academy courses. We hand over the program backup, drawings, and manuals, and 24-hour service support starts from there.

    You receiveTraining certificates, handover documents

    Typical time3–5 days

Durations are examples. They depend on the cell size, the number of robots, and your site schedule.

Any process. We answer in cycle times.

Tell us the process, the part, and the target cycle time. An application engineer will lay out the cell in Hangyeol Studio and calculate the cycle time for you.

Service 24/7
+82 53-0614-2790