Case 5 · Cheonan, Chungnam · Electronics and semiconductor back-end
We replaced aging insertion equipment on an odd-form line with eight HG-S6-50 SCARA robots. Cycle time per part fell from 0.41 s to 0.33 s.
ExampleAll figures are examples, compared with the same process before automation.
Cell layout
The cell seen from above. Dashed circles show how far each robot’s wrist reaches. Press a + button to open the note for that spot.
9
Opening a guard door stops the robots in that zone.
1
Facing robots split the work area over the board. Their collision-free paths were planned in Hangyeol Studio.
12
It photographs each picked part from below and corrects the insertion point part by part.
Cell layout for an electronic components maker in Cheonan, Chungnam, seen from above.
Parts list Select a row to pick out those items on the layout.
Problem → solution → result
The line inserted odd-form parts such as connectors and coils into power boards. The old equipment took 0.41 s per part and set the pace for the whole line.
Mis-picks were frequent, and operators at the end of the line filled in missing parts by hand.
Four HG-S6-50 robots on each side of the board conveyor face each other, with part trays on the outside. Facing pairs split the work area, and their collision-free paths were planned in Hangyeol Studio.
After each pick, an upward-looking camera checks the part and corrects the insertion point. Opening a door in the machine guard stops the robots in that zone.
Cycle time per part dropped from 0.41 s to 0.33 s, raising hourly throughput by 24%. The mis-pick rate fell from 0.12% to 0.03%, and hand-filling at the end of the line has nearly stopped.
Robots and timeline

SCARA
A 500 mm SCARA with a 0.32 s standard cycle for fast small-part work on boards
Time on site
1 week to install, 3 weeks to commission
More cases
Namdong, Incheon · Distribution center
HG-M600 × 5
31kmWalking replaced per dayExample
Gyeongsan, Gyeongbuk · Automotive seat-parts maker
HG-R12-14 × 4
19%Shorter cycle timeExample
Ochang, Chungbuk · Battery module maker
HG-C16-10 × 6
0boltsMissed fastenings, first 3 monthsExample
These cases are examples made for this portfolio. Customers are not named, and every figure is an example compared with the same process before automation.